| « back | ||
| Page location: Etusivu » Home » Services » Coordination of programmes and projects » ADINE | ||
ADINE
ADINE is a FP6-TREN-4 project under execution during October 2007 - November 2010. The problem - need for the projectConsiderable amount of renewable energy in Europe represents Distributed Electricity Generation (DG). However, the electricity distribution systems have been designed without considering interconnection of DG. One of the main barriers to the penetration of DG at the distribution network level is the complexity of the interconnection process of DG into the network. The solution developedThis project develops, demonstrates and validates a new method for the active management of a distribution network and the enabling solutions to support it. The solutions operate as active components in managing the network to enable an easy interconnection of different DG units. The solutions cover the protection of the network, planning and information systems, and voltage and reactive power control. Project partners
Results and materials
|
||
| http://www.hermia.fi/in_english/services/coordination-of-programmes-and-p/adine/ | 23.2.2012 klo 07:08:10 | |