Public materials of the ADINE project

ADINE D63 Final definition af ANM method (1.7 MB)
The Final definition af ANM method
ADINE D62 Result summary report on ANM Simulations (3.2 MB)
The result summary report on ANM Simulations
ADINE D59 Results summary report on voltage control (630 kB)
Results summary report on voltage control
ADINE D58 Result summary report on planning methods (520 kB)
Result summary report on planning methods
ADINE D57 Results summary report on fault location solutions (231 kB)
Results summary report on fault location solutions
ADINE D56 Results summary report protection relay applications (1.2 MB)
Results summary report protection relay applications
ADINE D55 Summary from 2nd round workshops (6.1 MB)
Summary from 2nd round workshops
ADINE D54 Public project review period 6 (285 kB)
Public project review period 6
ADINE D53 Result summary report on microturbine performance (458 kB)
The Result summary report on microturbine performance
ADINE D 44 Demonstration report on the use of new planning method (662 kB)
The report of use of new planning method
ADINE D 40 Public project review period 5 (267 kB)
This is the fifth newsletter of ADINE project.
ADINE D37 Technical description of RTDS/dSPACE simulation environment (602 kB)
The report which descripes technical description of RTDS/dSPACE simulation environment.
ADINE D33 Public project review period 4 (183 kB)
This is the fourts newsletter of ADINE project
ADINE D30 Summary from 1st round workshops (426 kB)
The report of workshops of ADINE
ADINE D23 Real-time simulation results report (1.4 MB)
The report descripes development of control system. Realtime simulations were done a lot earlier but for other type of compensation environment than is was planned for the demo case.
ADINE D20 Public project review period 3  (455 kB)
This is the third newsletter of ADINE project
ADINED17 Initial definition of ANM method (1.1 MB)
The report describes the initial definition of distribution network management concept which is under development in ADINE project. The network management concept is based on existing concept completed with new features and functions. It is a complex system of devices, automation systems and practices which include protection relays, controllers, telecommunication, substation and feeder automation systems, control centre software like SCADA and distribution management system, and guidelines for network planning and operation.
ADINE D13 Non-Real-Time Simulation Results Report (817 kB)
This report is prepared as a part of ADINE subproject 4, SP4 - Flexible STATCOM for distribution network. The goal of SP4 is to develop and demonstrate a static synchronous compensator (STATCOM) capable of filtering harmonics, eliminating flickers, compensating reactive power, controlling the voltage level and improving the recovery of the distribution network during line fault.
ADINE D11 Public Project Review period 2 (676 kB)
This is the second newsletter of ADINE-project.
ADINE D10 Demonstration report on the use of existing voltage control methods (595 kB)
Deliverable 9 of the project concentrates on the possibilities of applying present network planning tools for the interconnection of a new DG unit. The report focuses mainly on protection planning aspects.
ADINE D9 Demonstration report on the use of existing planning tools (618 kB)
Deliverable 9 of the project concentrates on the possibilities of applying present network planning tools for the interconnection of a new DG unit. The report focuses mainly on protection planning aspects.
ADINE D8 Basic Study Report (654 kB)
Deliverable 8 of the project is the brief basic study about distributed electricity generation and related grid issues in target countries.
ADINE D4 description of document management (1.1 MB)
Deliverable 4 of the project describes these web-pages and the document management system which is used in the project.
ADINE newsletter 1 (376 kB)
Deliverable 2 of the project. This public project review is ment to inform the public audience about proceeding and results.
ADINE Dissemination plan rev1.1 (411 kB)
Deliverable 3 of the project describing the target groups, key messages, media... basically the whole public interface to the project. Revision 1.1.
ADINE Smart grid presentation March 2008 (322 kB)
ADINE poster March 2008 (2.5 MB)